Empowering Communities Through Sustainable Harvesting. Every harvest is weighed, receipted and recorded.

From community to export

Operations

Eleven connected steps turn a harvester’s delivery into a receipted, paid and traceable record.

The operational workflow

This is the sequence every harvest follows. Internal procedures and financial records are not published here.

  1. Step 1

    Community engagement

    Introduce NURA, agree harvesting arrangements and local contacts.

  2. Step 2

    Training and registration

    Register harvesters, collect required documents and train in sustainable practice.

  3. Step 3

    Product collection

    Harvesters deliver fruit to an approved collection point in season.

  4. Step 4

    Grading and weighing

    Fruit is graded and weighed by grade with the harvester present.

  5. Step 5

    Transaction recording

    The aggregator records the delivery; the system checks prices and deductions on the server.

  6. Step 6

    Receipt generation

    A numbered receipt is issued for every recorded transaction.

  7. Step 7

    Payment processing

    Finance builds paysheets, an authorised approver signs them off, and payments are recorded in full or in part.

  8. Step 8

    Product labelling

    Batches and crates receive printed labels with QR codes.

  9. Step 9

    Transportation

    Crates are loaded against a manifest and moved to the factory or warehouse.

  10. Step 10

    Warehouse receipt

    Goods are counted and weighed on arrival and reconciled against the manifest.

  11. Step 11

    Processing and export

    Reconciled stock is processed and shipped to buyers.

Explore further

See what we source and how we measure impact.

View products

A day at a collection point

The collection point is where fruit is delivered, quality is judged, weight is recorded and the collector is paid. Every step is designed so the collector can see and trust it.

  1. Step 1

    Opening checks

    The aggregator arrives early and checks the scale against a test weight. If it is more than 200 g out, collection waits until it is fixed.

  2. Step 2

    Identity check

    Only collectors on the registered list may sell. The committee secretary verifies each person.

  3. Step 3

    Visual inspection

    A sample is checked for ripeness, damage, mould or fermentation, and contamination.

  4. Step 4

    Grading

    The batch is graded or rejected. Rejected fruit goes back to the collector with the reason explained.

  5. Step 5

    Weighing

    Accepted fruit is weighed in bags of up to 50 kg, with the empty bag weight deducted and the net weight confirmed to the collector.

  6. Step 6

    Receipt

    A receipt shows the collector, date, collection point, net weight, grade, price and amount due. The collector gets a copy immediately.

  7. Step 7

    Tag and seal

    Each bag is sealed and tagged with its ID, zone, collection point, date, collector and weight, plus a QR sticker.

  8. Step 8

    Daily records

    At day end the aggregator sends the records to head office and files the daily collection report.

The Bulawayo processing plant

NURA’s processing facility is in Bulawayo, Zimbabwe’s second-largest city, chosen for its central position, industrial infrastructure and road and rail links. It operates on a contract-tolling model.

  • Cold-pressed oil

    Marula kernel oil is extracted by cold press, with no heat, to preserve nutritional and cosmetic qualities.

  • Whole-fruit use

    Pulp, kernels, shells and press cake each find a use: oil, dried pulp, kernel meal for animal feed and shell compost.

  • Food-grade standards

    Food-grade production throughout, with export compliance and phytosanitary certification maintained.

  • Seasonal capacity

    Peak processing runs November to April, with capacity of 100 to 500 tonnes of raw fruit a month.

  • Traceability

    A 5% random sample of every delivery is re-inspected on arrival and the zone of origin is accountable for downgrades.

Harvesters wanted

Harvest with NURA Organica

Register your harvesting area on the map in two minutes. Our team reviews it, and we guide you through the rest.

  1. 1Pin your areaPlace your harvesting area on the map.
  2. 2We review itOur team checks it against the NURA map.
  3. 3Sign and startAgreement, letter and ID card issued.

Register as Harvester here Harvester role details